NOTES TAKEN AT A PUBLIC MEETING HELD ON 6th JANUARY 2005 AT THE WILLIAM PENN LEISURE CENTRE

The meeting was called by Three Rivers District Council, (TRDC), jointly with the Management of the Centre, but was not widely publicised. It was chaired by John Welham and attended by Chris Hope, TRDC Head of Leisure Services and Jane Hilton, Manager of the Centre. 30 persons attended the meeting, the majority ladies and most were regular users of the swimming pool.
The meeting had been called to brief the public on the proposal to refurbish the Centre's "wet" facilities, i.e., the swimming pool and supporting infrastructure. TRDC's Leisure and Community Policy Panel had met on the 9th November 2004 to discuss the feasibility report on the options developed by the Council's consultants. The consultants had been appointed to advise on extending the life of the wet facility, but not the Centre's Health and Fitness area. Three options were offered to the Council for consideration:

Option A - Minimal Refurbishment:
This would involve altering the pool changing rooms into a "changing village" with a unisex changing area and separate cubicles that opened up to the pool surround. The existing plant room would be retained, but new equipment would be fitted as maintenance is becoming more expensive with the passing of time. The "wet" health facility would be incorporated into the changing room area. The pool hall and pool tank would be completely refurbished, to include a new staircase and lift to the first floor spectators' gallery for the benefit of disabled patrons. The estimated cost of the workpackage would be £2.02M, simply to sustain the existing facility over the next 20 years.

Option B - Full Refurbishment / Part Redevelopment:
This option included work in the foyer and on some of the "dry" facilities. (The term for the squash courts, health and fitness facilities, etc.). A new reception area would be re-provided on the left side of the existing entrance to make space for a new "learners' pool" and a vending / catering function. The fitness studio would be consolidated into one area. The existing "wet" side changing rooms would be demolished and redeveloped with group changing and unisex changing areas visible from the pool. (The lifeguards will be able to monitor the changing area from the pool). Two new aerobics' studios would be provided on the first floor. The "wet" health facility would not be moved, but it would be refurbished. The pool hall, plant room and pool tank would be completely refurbished, to include a new staircase and lift to the first floor spectators' gallery for the benefit of disabled patrons, as in Option 1. The estimated cost of the workpackage would be £3.25M.

Option C - New Build (Wet Side):
This proposal would involve a new build for the wet side of the Centre, covering the changing rooms, pool, and health area. The opportunity would be taken to install a new 25m tank and to raise the level of the "wet" side to the level of the foyer. Additional facilities would include a cafÈ overlooking the poolside, a new entrance lobby, a crËche / party room on the left-hand side of the foyer, a dance studio at the rear of the foyer and a new function room. The first floor would incorporate the relocated fitness area, sited partly over the pool. The estimated cost of this option would be £4.46M.
Before speaking, John Welham displayed diagrams of the options and stated these would be displayed in the foyer for public viewing. In his opening remarks, he stressed that the Council was committed to retaining the Centre as a public amenity and announced that the Leisure and Community Policy Panel intended to recommend to the Council that Option B be approved as the preferred option. He added that the proposed refurbishment had been under discussion for nearly two years, because surveys of the "wet" side suggested that the area was approaching the end of its natural life. Other major considerations included the increasing cost of maintaining the pool and associated plant, the inadequacy of the changing facilities and the effort required to keep the area clean. It does appear that more ladies use the pool than gents do, and at times the ratio is 75% ladies to 25% gents. John Welham invited those present to consider the benefits to be derived by having a crËche and a learners' pool, plus the increased "dry" facilities.

When invited to comment on Option B the audience reacted immediately, and unfavourably, to the idea of the unisex changing facility. This aspect of the presentation may have been ambiguous and misinterpreted by the audience, but it was self evident that the concept of modesty was important to those present at the meeting. The Centre's management team will no doubt be asked to clarify this aspect of the proposal as more people are made aware of Option B.

Inevitably there were questions on costs and the implications for prices of admission to the refurbished pool. Chris Hope informed the meeting that he did not have details of future prices but was able to say that the pricing regime would be "cost neutral", i.e., income should meet costs. When asked for clarification about the existing contractual arrangements between the Centre's management and the Council, Chris Hope implied that, as written, the Council was accountable for some of the Centre's running costs. It appears that the Council has been providing a subsidy of the order of £150,000 per year to the Centre's upkeep.
The audience asked questions about the refurbishment programme and use of the "dry" facilities during the refurbishment period. Chris Hope explained that the existing management contract would be renegotiated during 2005, so work would not start before 2006 and would take about eighteen months to complete. In that period the "dry" side would continue to function, but inevitably with some restrictions at certain stages of the refurbishment. The audience enquired if the Council would be arranging an alternative venue for those who wanted to continue swimming. It became apparent that among those present were people who used the pool to improve fitness and mobility. Some feared if they were unable to swim for eighteen months they would find it difficult to re-start swimming when the pool becomes available. Chris Hope was able to offer some re-assurance on this point when he stated that the Council was trying to make arrangements for the use of a local school's swimming pool. He did not believe that the Sir James Altham pool at South Oxhey could accommodate a large number of additional swimmers.
Other topics covered during the discussion included improving hygiene by the use of foot baths and showers as swimmers entered the pool, the charge for using lockers, the likely outcome of an application for National Lottery funding, the advisability of the life guards having to monitor behaviour in the open plan changing village and the intention to discontinue the use of the kitchen in favour of the vending area.
One member of the audience, a lapsed swimmer, expressed some concern about the overall cost of the refurbishment. He questioned the need for such a large work package and suggested that Chris Hope's mention of £2M for the cost of upgrading the pool's plant seemed excessive. He expressed surprise at the size of the subsidy given by the Council under present arrangements and linked this thought to the impending closure of Watersmeet. He asked the audience to consider this point and did get some support from others who did not want to see Watersmeet close.
Before the meeting was brought to a close at 9pm, members of the audience expressed their appreciation for the commitment and the service provided by the staff.
NOTE: The architect's plan for Option B will remain on display in the foyer, together with other information for the foreseeable future.